30–20,000 kVA, amorphous SBH available; two-winding, split-winding, on-load tap changing and export voltage ratios built to order.
Ranges below are our standard build; project-specific values are per technical agreement and routine test report.
| Item | Range / note |
|---|---|
| Series | S11 / S13 / S20 / S22; SBH15 / SBH21 / SBH25 (amorphous alloy) |
| Rated power | 30 – 20,000 kVA (distribution 30–2,500 kVA; larger ratings at 35 kV) |
| Voltage ratio | 10/0.4, 20/0.4, 35/0.4, 35/10.5 kV; other ratios to destination standard |
| Phases / windings | Three-phase or single-phase; two-winding, split-winding optional |
| Tap changing | Off-circuit (standard), on-load (optional) |
| Cooling | ONAN (standard), ONAF (optional) |
| Vector group | Dyn11, Yyn0 and others per project |
| Insulation / temperature rise | Class A; temperature rise per GB 1094 and contract |
| Standards | GB 1094 / GB/T 6451; IEC 60076 or customer standard for export |
| Efficiency class | Grade 1 / 2 / 3 available — as stated on the routine test report |
| Finish | Outdoor, anti-corrosion paint; tropical, salt-spray and high-altitude versions available |
Classic distribution. Lowest first cost and fastest supply; adequate for intermittent duty and budget-driven projects.
Low loss. Lower no-load loss; on continuously energised units the energy saving pays back the price gap within a few years.
High efficiency. For efficiency audits, green building credits and tenders where loss figures are scored.
Ultra-low no-load loss. Best where units sit lightly loaded for long periods — PV, wind, night-heavy-load feeders.
| Type | Lead time | Conditions |
|---|---|---|
| Standard rating, expedited | 7 days | Model on stock list, drawing confirmed, down payment received |
| Regular order | 15–30 days | Standard parameters, scheduled batch |
| Custom / export build | 25–35 days | Special voltage, frequency, IP rating, certification |
Reports ship with the goods. Lightning impulse, temperature rise and sound level tests can be added on request.
| # | Test | Purpose |
|---|---|---|
| 1 | Visual and nameplate check | Confirm rating, ratio and arrangement against drawing |
| 2 | Insulation resistance | Detect moisture and insulation defects |
| 3 | Winding DC resistance | Verify joints and detect turn faults |
| 4 | Voltage ratio and vector group | Confirm turns ratio and connection |
| 5 | No-load loss and current | Verify core performance and efficiency class |
| 6 | Load loss and impedance | Verify winding design and thermal margin |
| 7 | Power-frequency / induced overvoltage | Verify major and longitudinal insulation |
Tel / WeChat +86 189 6972 3308 Email cnpengbian@126.com
Request a quotation →